Gülser Eisenbahnbrücke v1.0
The Trier – Koblenz line crosses the Moselle on it.
The Güls railway bridge was built almost simultaneously with the Horchheim railway bridge over the Rhine. Both bridges were used to connect the Moselle route to the so-called “Kanonenbahn” Berlin – Metz. Construction work on the bridge began in April 1877 and was completed in October 1878.
Since it was missing in MSFS, I added it.
GPS Coordinates: 50.345 7.553