BGGH – Nuuk Airport (new 2.200 meter runway) v1.6
Nuuk Airport will become the busiest airport thanks to its new 2,200-meter-long runway (04-22). Air Greenland’s Airbus A330neo will finally be able to land there. SAS and United will operate as new airlines in the summer of 2025 The new runway will be inaugurated on November 28, 2024.
This mod adds a (non-real) interpretation of the terminal building, a new apron with 4 parking lots with spotlights was added. In addition, fences were added around the buildings with the illuminated car parking lot.
Apart from the airport, the trees were removed from all over Nuuk because they don’t exist in Greenland.
Please note that this is just the first version, and it will be improved in the future.
GPS Coordinates
64.192201, -51.678022